Cherreads

Chapter 80 - Placements

With ideas and locations in mind, he began by first selecting the power annexes, and first by the central ones, then the interior and outer power annexes, placing each and followed by the next one on its outermost perimeters. As he placed each of the power annexes, he saw the power distribution widen, though not yet happening, but as predicted in the management system, it saved him a lot of time, so that once it finished construction, it would immediately be built.

However, before that, he focused on the central area, and then surrounded it with concrete walls, which were then given ramparts and towering structures, which were then given flak cannons and automated turrets, followed by cameras and maintenance facilities near it.

Nearby, he placed the core batteries, which would power the structures, followed by the backup and emergency battery supplies. This would then guarantee that it would at least run for a few dozen hours after the power went out.

This is the end of Part One, download Chereads app to continue:
More Chapters